Excavation for Drop Structure Number 2
Excavators prepare for placement of drop structure number 2 (foreground). The first structure will be located in the vicinity of the excavator in the background. Twin 48-in tubes divert river water around the construction site.
Photo Credit: Scott Murphy
View Full Size