SlideShow

  • image001-1
  • image002-1
  • Parks and Wildlife Meeting to Discuss Fish Passage
  • Looking Upstream at Drops 1 through 4
  • ADA Put-In Ramp Under Construction
  • Water Park Work Site Overview
  • Drop 3 under construction
  • Drops 3 and 4 complete
  • Looking upstream at Drop 3
  • Final Touches on Drop 4
  • New Recreation Trail
  • New Recreation Trail
  • Uncompahgre River South of Riverbottom Pedestrian
  • Completed Water Structure Bypass
  • Excavation for Drop Structure Number 2
  • Concrete Pumping on Drop Structure 2
  • Construction of Drop Structure 2
  • Construction Area Bypass Tubes
  • Montrose Water Sports Park Area
  • Terraced Spectator Area
  • Completed Drop Structures
  • Surfing Wave on Drop Structure Number 1
  • Colorado Parks and Wildlife Fish Survey
  • Diversion Around Drop Structures 3 and 4

Show previous set of thumbnails

Show next set of thumbnails

◄ Back to Montrose Water Sports Park Construction photos