Project Summary
- Designer: City of Montrose Engineering Staff
- Contractor: Mountain Valley Contracting (Grand Junction, CO)
- Final Construction Cost: $425k
- Completed: May 2020
Project Overview
This project was part of a multi-year effort to improve city water infrastructure that transports water from the main Project 7 supply line at Highway 50 to the Sunnyside Tank. The project was identified as a critical need in the city's Water Master Plan and has been implemented in phases since 2016.
In 2019 the city upsized an existing 12-inch line along 6800 Road between Miami and Sunnyside roads to a 24-inch line. This phase of the project upsized the remainder of the line along Miami Road between 6800 Road and Highway 50.